Servicing Work Order Line

ID Quantity Performed Cost Completion Notes Restoration Standard Met Follow Up Required Component Group Unit Of Measurement Work Order Activity
1 1.0 1850.0 Site cleared, minor vegetation removed. Deck Surface Each Routine deck and site maintenance. General site maintenance — vegetation, debris and ...
2 1.0 3200.0 Treatment applied to 6 piles and 2 headstocks. Timber Bridge Each Termite prevention treatment, timber substructure. Termite prevention treatment of timber substructur...
3 18.0 4100.0 Debris and silt removed from upstream face. Waterway Cubic metre Waterway debris removal and scour check. Waterway maintenance — debris removal and scour pr...
4 42.0 2650.0 42 fasteners re-torqued to specification. Bridge Superstructure Each Tighten loose fasteners identified during inspecti... Maintain fastener tightness on steel and timber co...
5 24.0 5300.0 Rip-rap top-up at pier 2 and abutment. Waterway Cubic metre Scour protection top-up at piers. Waterway maintenance — debris removal and scour pr...
6 9.0 2100.0 Invert cleared, minor sediment build-up removed. Waterway Cubic metre Culvert invert and inlet debris removal. Waterway maintenance — debris removal and scour pr...
7 1.0 950.0 Inlet/outlet vegetation cleared. Culvert Each Vegetation clearing at culvert inlet/outlet. General site maintenance — vegetation, debris and ...
8 210.0 2400.0 Deck surface and joints cleaned. Deck Surface Square metre Deck cleaning, expansion joints and scuppers. Deck and drainage cleaning — removal of debris and...
9 1.0 8750.0 Emergency props installed to corbel; permanent rep... Timber Bridge Each Emergency propping of failing corbel — structure l... Emergency propping of damaged or failing structura...