ID Quantity Labour Cost Plant Cost Material Cost Contractor Cost Total Cost Cost Date Activity Unit Of Measurement Work Order
1 1.0 900.0 400.0 350.0 200.0 1850.0 2026-02-23 09:00 General site maintenance — vegetation, debris and ... Each Routine deck and site maintenance.
2 1.0 1400.0 600.0 1000.0 200.0 3200.0 2025-06-23 09:00 Termite prevention treatment of timber substructur... Each Termite prevention treatment, timber substructure.
3 18.0 1600.0 1500.0 600.0 400.0 4100.0 2025-10-06 09:00 Waterway maintenance — debris removal and scour pr... Cubic metre Waterway debris removal and scour check.
4 42.0 1500.0 700.0 250.0 200.0 2650.0 2025-07-03 09:00 Maintain fastener tightness on steel and timber co... Each Tighten loose fasteners identified during inspecti...
5 24.0 2000.0 2000.0 1000.0 300.0 5300.0 2025-11-05 09:00 Waterway maintenance — debris removal and scour pr... Cubic metre Scour protection top-up at piers.
6 9.0 900.0 800.0 200.0 200.0 2100.0 2025-07-18 09:00 Waterway maintenance — debris removal and scour pr... Cubic metre Culvert invert and inlet debris removal.
7 1.0 500.0 250.0 100.0 100.0 950.0 2026-02-28 09:00 General site maintenance — vegetation, debris and ... Each Vegetation clearing at culvert inlet/outlet.
8 210.0 1200.0 700.0 200.0 300.0 2400.0 2026-01-19 09:00 Deck and drainage cleaning — removal of debris and... Square metre Deck cleaning, expansion joints and scuppers.
9 1.0 2500.0 3000.0 2250.0 1000.0 8750.0 2026-06-30 09:00 Emergency propping of damaged or failing structura... Each Emergency propping of failing corbel — structure l...