Servicing Activity Detail

ID Category Description Restoration Standard Requirements Plant Requirements Materials Requirements Manpower Approvals Required Work Procedure Text Planning Points Text Unit Of Measurement
1 PreventativeMaintenance Apply approved timber preservative to exposed pile... Timber surfaces treated to achieve uniform preserv... Utility truck; elevated work platform; low-pressur... Approved timber preservative (boron/copper-based);... 1 Leading Hand; 1-2 Labourers Bridge Asset Management approval for preservative ... Install traffic control per traffic management pla... Consult Structures Division if decay exceeds 20% o... Lineal metre
2 PreventativeMaintenance Inspect and treat timber substructure for termite ... No visible termite activity or damage at treated z... Utility truck; soil injection equipment Approved termicide; termite monitoring stations 1 Licensed pest control operator; 1 Labourer Chemical use approval; qualification/licence sight... Install traffic control if working within envelope... Records must be stored in BIS and hard copy archiv... Each
3 PreventativeMaintenance Remove accumulated debris, silt and vegetation fro... Deck surface and drainage free of debris, ponding ... Utility truck; high-pressure washer; vacuum sweepe... General cleaning consumables 1 Leading Hand; 2 Labourers Potable water use restriction check if using town ... Install traffic control per traffic management pla... Check for potable water restrictions before drawin... Square metre
4 PreventativeMaintenance Remove debris accumulation and inspect scour prote... Waterway channel and scour protection at structure... Utility truck; excavator or backhoe; chainsaw Rock/rip-rap for minor scour protection top-up 1 Leading Hand; 2 Labourers Watercourse works approval under the Water Act gui... Install traffic control if plant operates from car... Environmental officer consultation required for in... Cubic metre
5 ReactiveMaintenance Rectify guardrail or bridge rail damaged by vehicl... Guardrail/bridge rail restored to original alignme... Utility truck; post driver; welding equipment Replacement rail sections, posts and fasteners to ... 1 Leading Hand; 2 Labourers Bridge Asset Management approval for non-standard ... Install traffic control per traffic management pla... Refer to Structures Division if impact has damaged... Lineal metre
6 ReactiveMaintenance Install emergency propping to a damaged or failing... Structural element temporarily supported and stabi... Crane or hiab; adjustable steel props; timber pack... Steel props, timber packers, bracing 1 Engineer/Leading Hand; 2-3 Labourers Structures Division approval required before and a... Close structure or install traffic control/load re... This work is outside routine servicing scope — alw... Each