Activity Procedure Step

ID Step No Instruction Condition Safety Note Inspection Note Creates Follow Up Action Activity
1 1 Install traffic control per traffic management pla... - Confirm traffic control setup matches the approved... Wear high-visibility PPE at all times. Timber preservation treatment of piles, corbels an...
2 2 Inspect timber surfaces and identify treatment ext... - Photograph existing condition before starting work... - Timber preservation treatment of piles, corbels an...
3 3 Apply preservative treatment to identified surface... - - Use fall protection when working over water or at ... Timber preservation treatment of piles, corbels an...
4 4 Record treatment area, product and batch number - Confirm work area is left clean and safe before de... - Timber preservation treatment of piles, corbels an...
5 5 Remove traffic control and restore site - Confirm traffic control setup matches the approved... Wear high-visibility PPE at all times. Timber preservation treatment of piles, corbels an...
6 1 Install traffic control if working within envelope - Confirm traffic control setup matches the approved... Wear high-visibility PPE at all times. Termite prevention treatment of timber substructur...
7 2 Inspect substructure and monitoring stations for t... - Photograph existing condition before starting work... - Termite prevention treatment of timber substructur...
8 3 Apply approved termicide to affected zone - - Use fall protection when working over water or at ... Termite prevention treatment of timber substructur...
9 4 Record chemical/poison used, date, location and op... - Confirm work area is left clean and safe before de... - Termite prevention treatment of timber substructur...
10 5 Remove traffic control and restore site - Confirm traffic control setup matches the approved... Wear high-visibility PPE at all times. Termite prevention treatment of timber substructur...