| ID | Step No | Instruction | Condition | Safety Note | Inspection Note | Creates Follow Up Action | Activity |
|---|---|---|---|---|---|---|---|
| 1 | 1 | Install traffic control per traffic management pla... | - | Confirm traffic control setup matches the approved... | Wear high-visibility PPE at all times. | ✗ | Timber preservation treatment of piles, corbels an... |
| 2 | 2 | Inspect timber surfaces and identify treatment ext... | - | Photograph existing condition before starting work... | - | ✗ | Timber preservation treatment of piles, corbels an... |
| 3 | 3 | Apply preservative treatment to identified surface... | - | - | Use fall protection when working over water or at ... | ✗ | Timber preservation treatment of piles, corbels an... |
| 4 | 4 | Record treatment area, product and batch number | - | Confirm work area is left clean and safe before de... | - | ✗ | Timber preservation treatment of piles, corbels an... |
| 5 | 5 | Remove traffic control and restore site | - | Confirm traffic control setup matches the approved... | Wear high-visibility PPE at all times. | ✗ | Timber preservation treatment of piles, corbels an... |
| 6 | 1 | Install traffic control if working within envelope | - | Confirm traffic control setup matches the approved... | Wear high-visibility PPE at all times. | ✗ | Termite prevention treatment of timber substructur... |
| 7 | 2 | Inspect substructure and monitoring stations for t... | - | Photograph existing condition before starting work... | - | ✗ | Termite prevention treatment of timber substructur... |
| 8 | 3 | Apply approved termicide to affected zone | - | - | Use fall protection when working over water or at ... | ✗ | Termite prevention treatment of timber substructur... |
| 9 | 4 | Record chemical/poison used, date, location and op... | - | Confirm work area is left clean and safe before de... | - | ✗ | Termite prevention treatment of timber substructur... |
| 10 | 5 | Remove traffic control and restore site | - | Confirm traffic control setup matches the approved... | Wear high-visibility PPE at all times. | ✗ | Termite prevention treatment of timber substructur... |